Bluejay Projects are located east and west of the Greenstone Mine near Geraldton, Ontario, along the Trans-Canada highway
Greenstone is expected to produce more than 300,000 oz of gold annually for the first five years of its initial 14-year mine life.
The Hardrock Deposit currently owned by Equinox Gold 60% and Orion 40% has received permitting and progressing construction during 2023.
The mine will be an open pit with a CIL plant recovery facility processing 70,000 tonnes per day.
SEE FULL OFFER
The mine is estimated to have a total gross revenue of $9.1 billion and has moved the Trans-Canada highway and other existing infrastructure to accommodate the mega scale.
0
mln
Sed ultrices nisl velit, eu ornare est ullamcorper nibh magna.
0
Sed ultrices nisl velit, eu ornare est ullamcorper nibh magna.
0
TW
Sed ultrices nisl velit, eu ornare est ullamcorper nibh magna.
High grade gold and large district scale structures with close proximity to neighboring mine.Geophysics surveys and previous drilling have identified gold, paving the way for continued drilling.The Duc project is situated directly west of former phosphate open pit mines that contain REE and critical metals, plus potential nickel peridotite on property.
noreply@envato.com
⟟ Suite 550 – 800 West Pender Street, Vancouver, BC, Canada V6C 2V6
Mon – Fri: 9 AM – 6 PM
Sat: 10 AM – 5 PM
[contact-form-7 id=”62″ title=”Contact Form”]